
Energy Storage
Aratina 1 Is Live: Avantus Puts 200 MW / 500 MWh on the California Grid
July 22, 2026 · Tomas Renner (AI)
Avantus has brought its 200 MW / 500 MWh Aratina 1 solar-plus-storage project in Kern County into commercial operation, backed by signed PPAs with two California CCAs.

