Four-hour battery storage is now cheaper than new open-cycle gas turbines in all 43 markets where Wood Mackenzie modeled both technologies - a finding the firm published on October 8, 2026 that spans Europe, North America, Latin America, Asia Pacific, and the Middle East and Africa[1]. That's not a forecast. That's the current levelized cost of electricity (LCOE) crossover, already in place, already global.
The headline number for the US is striking. For a 2026 commercial operation date, 4-hour battery storage is 65% to 75% cheaper than new open-cycle gas turbine peakers, depending on whether state-level carbon pricing applies[1]. Wood Mackenzie did not publish absolute $/MWh figures for every market - the US figure came via a spokesperson email to Utility Dive - so treat the precise spread with appropriate caution. But the directional conclusion is hard to argue with: the cost gap is wide, and it is widening.
"This economic shift is decisive and widening," Ahmed Jameel Abdullah, principal analyst at Wood Mackenzie, said in a statement[1].

Why Gas Peakers Are Losing the Cost Race
The battery side of this equation is well understood: manufacturing scale, LFP chemistry maturation, and falling cell prices have driven LCOE down steadily. What's less appreciated is how badly the gas side has deteriorated.
Gas turbine prices are projected to reach $600/kW by the end of 2027 - a 195% increase since 2019, according to a separate Wood Mackenzie analysis published earlier this year. The three major OEMs - GE Vernova, Siemens Energy, and Mitsubishi - each carry backlogs ranging from 35 GW to 116 GW[1]. Global gas turbine orders stood at 110 GW at the end of 2025, against global manufacturing capacity of only 60-70 GW per year.
The supply-demand mismatch has cascading effects. Lead times for large-frame turbines now stretch beyond five years. Specialized labor shortages, component bottlenecks in hot-section manufacturing, and trade-related cost pressures compound the problem and, as Wood Mackenzie's Aurora Tenorio put it, "will affect US power investments well into the next decade." That's not a temporary disruption - it's a structural repricing of gas peaking capacity.
In North America specifically, Wood Mackenzie describes gas investment as entering "a supply deficit cycle through the late 2030s," driven by data center load growth, a dynamic that keeps thermal capital costs elevated[1].
The Data Center Multiplier
The same load growth that is straining gas turbine supply chains is simultaneously strengthening the investment case for BESS. Wood Mackenzie's Q3 2026 US Energy Storage Monitor, released September 23, predicted US energy storage installations will grow over 50% in MW terms over the next five years[2].
The driver is explicit. "Data center buildout strengthens the U.S. storage outlook across all sectors. Storage can provide needed capacity faster, cheaper and more reliably than gas alone," said Allison Feeney, research analyst at Wood Mackenzie. "As hyperscalers increasingly face grid-connection bottlenecks, utility-scale storage will enable speed to power for data centers."
The Q2 2026 numbers back that up. The US BESS market installed a record 5.4 GW / 18.9 GWh in Q2 2026[2], even as installed power fell 7% year-over-year - a divergence explained by longer average durations. Average system duration rose from 2.8 hours to 3.5 hours over the same period, reflecting resource adequacy contracting that increasingly specifies 4-hour or longer discharge windows. That duration trend matters: it's the market moving toward exactly the configuration Wood Mackenzie's LCOE analysis benchmarks as cost-competitive.
Wood Mackenzie expects more than 130 GW / 534 GWh of new utility-scale BESS capacity to be installed in the US from 2026 through 2031, with the utility-scale segment growing at 8% per year on average, driven by data center power demand[2].
Regional Breakdown: Where the Numbers Are Sharpest
The cost advantage is global but not uniform. A few regions stand out:
Middle East and Africa: Utility-scale solar in the region already leads at $37/MWh, and 4-hour storage is forecast to fall 33% to $80/MWh by 2035, displacing gas peaking across every gas market in the region[1]. In the most competitive markets - Saudi Arabia and the UAE - solar LCOE is on track to fall below $20/MWh by 2033.
Asia Pacific: China's four-hour battery storage benchmark of $58/MWh sits more than 55% below the rest of the Asia Pacific average of $134/MWh, driven by domestic supply chain integration and manufacturing at scale. Competitive Chinese supply is expected to pull the regional average down to $92/MWh by 2036, though Japan, Australia, and the Philippines will remain at a premium due to import duties and domestic manufacturing policies.
North America: Tax credits continue to provide a competitive advantage for storage, partially counteracting foreign-entity-of-concern restrictions and supply chain constraints[1]. The ITC phase-out from 2038 will create a temporary cost spike, but Wood Mackenzie expects new battery chemistries, hardware commoditization, and domestic supply chain expansion to drive storage LCOE down 10% by 2060[1].
What the LCOE comparison does — and doesn't — tell you. The 4-hour cost advantage applies to the peaking application: covering evening demand spikes and balancing renewable generation. It does not mean a 4-hour battery can replace every function of a gas plant. Prolonged grid stress events, multi-day weather-driven demand, and firm capacity obligations all require different analysis. Tariffs, fuel subsidies, capacity market rules, and local-content requirements can also shift whether modeled advantages translate into signed offtake. The crossover is real; the operational scope is bounded.
What This Means for Project Economics
The operational consequence of this shift is straightforward: for any developer evaluating a new peaking asset with a 2026 or 2027 commercial operation date, the default economic case now favors BESS over open-cycle gas - before even accounting for the turbine procurement timeline problem.
A developer who hasn't already secured a gas turbine slot is looking at lead times that push delivery past 2030. At that point, they're not just competing against today's battery economics; they're competing against a storage market that Wood Mackenzie forecasts will be materially cheaper still. Battery turnkey capex did tick up roughly 2% recently - the first increase in three years, driven by a ~10% rebound in cell prices from their 2025 low on stronger demand and higher lithium prices - and capex is forecast to fall 12% by 2031 before lithium prices are expected to roughly double in 2029. That's a bump, not a reversal.
The structural picture, as Abdullah put it, is "no longer just about renewables becoming competitive. It is about storage and solar together redefining what the economics of a power system look like. From Latin America to Asia Pacific, the combination of falling storage costs and world-class renewable resources is closing off the economic case for new gas peaking capacity globally."
That's a strong claim. The data, at least for the 4-hour peaking window, supports it.
Does 4-hour storage actually replace gas peakers in all use cases?
No. The Wood Mackenzie LCOE comparison is specific to the 4-hour peaking application — covering evening demand spikes and short-duration balancing. Gas plants retain advantages for multi-day reliability events, firm capacity obligations, and situations where charging availability is constrained. The cost crossover is real for the peaking function; it does not extend to all grid services gas currently provides.
Why is the US cost advantage (65–75%) so much larger than the global headline suggests?
The US figure reflects the combined effect of gas turbine supply constraints (which inflate peaker capital costs) and Investment Tax Credits (which reduce storage LCOE). The 65–75% range depends on whether state-level carbon pricing applies. Wood Mackenzie did not publish absolute $/MWh figures — the number came via spokesperson email — so the precise spread should be read as an order-of-magnitude indicator, not a project-level input.
What happens to storage economics when the ITC phases out after 2038?
Wood Mackenzie expects a temporary cost spike following ITC phase-out. Over the longer term, new battery chemistries, hardware commoditization, and domestic supply chain expansion are expected to drive storage LCOE down 10% by 2060. The near-term trade restriction headwinds are expected to ease from 2028 as domestic cell manufacturing ramps up.
Why is China's storage LCOE so much lower than the rest of Asia Pacific?
China's four-hour storage benchmark of $58/MWh sits more than 55% below the Asia Pacific average of $134/MWh, driven by integrated domestic supply chains and manufacturing at scale. Competitive Chinese exports are expected to pull the regional average down to $92/MWh by 2036, though markets like Japan, Australia, and the Philippines will remain at a premium due to import duties and domestic manufacturing policies.